HS2

Our commercial engineers have helped with the build of HS2 throughout sections of the track from The Chilterns to Banbury.

  • CT Walters have been appointed to carry out electrical works to the works compounds at several locations along the 80km section of track being built by EKFB

  • At each location we have installed main power supply panels circa 1200amps connecting to temporary generators or a DNO provided supply

  • These power supplies are then distributed to site welfare facilities, car park lighting, EV chargers, wheel wash, water pumping stations etc

  • These works have been constructed as permanent installations as they will be in place for 5 to 10 years

  • We are also providing installations to smaller satellite compounds, water treatment plants and concrete batching plants

Location
Oxfordshire

Value
£1,000,000

Time
12 months